TUBING CONNECTIONS
SM DED 1-A.1 GB
11-1
11.
TUBING CONNECTIONS
11.1
Flaring Connection
The refrigerant pipes and IDUs are connected by using the flare opening.
Therefore, the quality of flaring connection must be ensured. The flaring depth
of the bell mouth cannot be smaller than the caliber. The flaring direction must
face towards the direction of medium flow. Use two torque wrenches to fasten
the connection.
11.2
Socket Welding
The gap between socket components should be proper to ensure that the
connection will not loose from the friction surface. The flaring direction of the
socket component must face towards the direction of medium flow .During pipe
connect, protect the braze welding part according the length specified below:
Summary of Contents for AWAU-YED076-H13
Page 11: ...OUTLINE DIMENSION 4 2 SM DED 1 A 1 GB 4 2 Outdoor YED076 YED095...
Page 20: ...REFRIGERATION DIAGRAMS SM DED 1 A 1 GB 10 1 10 REFRIGERATION DIAGRAMS...
Page 24: ...CONTROL SYSTEM SM DED 1 A 1 GB 12 1 12 CONTROL SYSTEM TO BE FINISHED TBD...
Page 25: ...TROUBLESHOOTING SM DED 1 A 1 GB 13 1 13 TROUBLESHOOTING TBD...
Page 30: ...EXPLODED VIEW SPARE PART LIST SM DED 1 A 1 GB 15 3 15 4 Exploded view of indoor unit DED095...
Page 32: ...EXPLODED VIEW SPARE PART LIST SM DED 1 A 1 GB 15 5 15 6 Exploded view of outdoor unit YED076...
Page 35: ...EXPLODED VIEW SPARE PART LIST 15 8 SM DED 1 A 1 GB 15 8 Exploded view of outdoor unit YED095...
Page 38: ...SM DED 1 A 1 GB 15 1 APPENDIX...