Installation Procedure

16

Electrical Wiring

Selection of size of power supply and interconnecting wires

Precautions for Electrical wiring

Electrical wiring work should be conducted only by authorized personnel.
Do not connect more than three wires to the terminal block. Always use round type crimped terminal lugs with insulated
grip on the ends of the wires.
Use copper conductor only.

Select wire sizes and circuit protection from table below. (This table shows 20 m length wires with less than 2% voltage
drop.)

DANGER OF BODILY INJURY OR DEATH

TURN OFF ELECTRIC POWER AT CIRCUIT BREAKER OR POWER SOURCE BEFORE MAKING ANY ELECTRIC
CONNECTIONS.
GROUND CONNECTIONS MUST BE COMPLETED BEFORE MAKING LINE VOLTAGE CONNECTIONS.

WARNING!

If the supply cord is damaged, it must be replaced by the manufacturer or itsservice agent or a similar qualified person.

 

If the fuse of control box is broken, please change it with the type of T25A/450VAC;
If the fuse of control PC board is broken, please change it with the type of T3.15A/250VAC. But for 

AW-YSDM048-H11

the type is T6.3A/250VAC.
The wiring method should be in line with the local wiring standard.
The power cable and connecting cable should be self-provided.
All the cables shall have got the European authentication certificate. During installation, when the connecting cables

 

break off, it must be assured that the grouding wire is the last one to be broken off.
The breaker of the air conditioner should be all-pole switch; and the distance between its two contacts should not be no

 

less than 3mm. Such means for disconnection must be incorporation in the fixed wiring.
The distance between its two terminal blocks of indoor unit and outdoor unit should not be over 5m. If exceeded, the

 

diameter of the wire should be enlarged according to the local wiring standard.
A leakage breaker must  be installed.

Wiring procedure

1) Remove set screws on the side before taking off the front panel toward the direction.
2) Connect wires to the terminal block correctly and fix the wires with a wire clamp equipped nearby the terminal block.
3) Route the wires in a proper way and penetrate the wires through the opening for electrical wiring on the side panel.

Item

Model

Phase

Switch breaker

(A)

Circuit  breaker

Overcurrent protector

rated capacity (A)

Power source

wire size

(minimum)

(mm

2

)

Switch

breaker(A)

Earth leakage breaker

Leak

current(mA)

AW-YSDM048-H11

30

1

40

30

6.0

40

The specification of power cable

For model 

AW-YSDM048-H11

 the power cable should be H05RN-F 3G 6.0mm

2

.

Summary of Contents for AW-YSDM048-H11

Page 1: ...before installation Keep this operation manual for future reference Contents Safety Precautions Read Before Installation Name of Parts Installation Procedure Troubleshootingve and Move and scrap the a...

Page 2: ...ction of the use of Certain Hazardous Substances in Electrical and Electronic Equipment EU RoHS Directive WEEE In accordance with the directive 2012 19 EU of the European parliament herewith we inform...

Page 3: ...UCTIONS These information can ensure the correct operation of the machine After a long time use of air conditioner the base should be checked for any damages If the damaged base is not repaired the un...

Page 4: ...moke or fire Only use refrigerant R410A as indicated on the unit when installing or relocating the unit The use of any other refrigerant or an introduction of air into the unit circuit may cause the u...

Page 5: ...e a charging cylinder The use of charging cylinder will change the composition of the refrigerant and lead to power loss Exercise special care when handling the tools An introduction of foreign object...

Page 6: ...Tear up the plastic bags before disposing of them to prevent accidents Properly dispose of the packing materials Do not touch the refrigerant pipes with bare hands during and immediately after operati...

Page 7: ...Refrigerant charging Vacuum Gauze Checking vacuum degree Tools Materials Use Notes Charging Cylinder Refrigerant Charging Must not be used with R410 type units CAUTION Items to Be Checked 1 Verify the...

Page 8: ...tightness If a clutch type flare tool is used to machine flares on units that use R410A make the protruding part of the pipe between 1 0 and 1 5mm Copper pipe gauge for adjusting the length of pipe pr...

Page 9: ...il from flowing back into the refrigerant circuit when the vacuum pump power is turned off power failure It is also possible to attach a check valve to the actual vacuum pump afterwards Standard degre...

Page 10: ...where obstacles do not exist near the air inlet and air outlet Place where the air outlet may not be exposed to a strong wind Place surrounded at four sides are not suitable for installation A 1m or...

Page 11: ...areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since drain flows out of the outdoor unit do not place under the unit anything which...

Page 12: ...ng information 2 Installation of outdoor unit Give enough room for the concrete foundation to fix by anchor bolts Place the concrete foundation deep enough Install the unit so that the angle of inclin...

Page 13: ...not to let foreign matters such as sands enter the pipe 4 Piping connection method Forced fastening without centering may damage the threads and cause a gas leakage Model One way piping length Vertica...

Page 14: ...kage will be found 3 Pressurize for about 24 hours at 3 0MPa 30 kg cm 2 g A small leakage will be found Air Tightness Test When pressurizing for 24 hours a variation of 1 C in the ambient temperature...

Page 15: ...the inspection of gas leakge No gas leakage In case of gas leakage tighten parts of pipe connection If leakage stops then proceed the step 6 If it does not stop gas leakage discharge whole refrigerant...

Page 16: ...able and connecting cable should be self provided All the cables shall have got the European authentication certificate During installation when the connecting cables break off it must be assured that...

Page 17: ...RE TO EXECUTE OFF OPERATION BEFORE ELECTRIC POWER IS DISCONNECTED FOR SERVICING This unit has a function of automatic restart system after recovering power stoppage 1 Before starting test run for all...

Page 18: ...Troubleshooting 18...

Page 19: ...itioning the content of lead mercury hexavalent chromium polybrominated biphenyls and polybrominated diphenyl ethers are not more than 0 1 mass fraction and cadmium is not more than 0 01 mass fraction...

Page 20: ......

Reviews: