Chapter 4
l
RN commissioning
Performing Loopback tests
Airvana ipBTS C30 Installation and Commissioning, Release 4.0
4-13
1. Understanding the backhaul loopback process.
2. Install external loopbacks on each backhaul cable.
This section describes how to create and install loopback connectors on each backhaul
cable.
•
For information about looping back Ethernet backhaul link(s), see
•
For information about looping back at the Ethernet port, see
3. Preparing for loopback tests.
This section describes how to enter CLI diagnostic mode and configure the test
parameters.
For more information, see
Entering diagnostic mode and configuring test parameters
4. Running loopback tests on each backhaul.
This section describes how to perform the loopback test for all backhaul links.
For more information, see
Performing external loopback tests on backhaul links
5. Troubleshooting failed backhaul link(s).
This section describes how to take additional steps to troubleshoot and correct any
backhaul link(s) that failed the external loopback tests.
For more information, see
Troubleshooting failed backhaul links
6. Removing physical loopbacks.
This section explains the external loops at the far end of all cables must be removed once
the Loopback testing is complete.
For more information, see
Once you have reviewed and understand the Loopback test process, continue with
Backhaul loopback testing
Loopback testing each backhaul link is a critical step that must be completed before the
technician leaves the site. These tests ensure the node is functional, the backhaul link(s) are
properly wired into the backhaul and (optionally) that the backhaul cables and any external
equipment to which they attach (up to the loop back point) are operational.
NOTE
This testing does not include backhaul
circuits
, only physical layer functionality at the cell
site. Backhaul
circuits
must undergo end-to-end testing and acceptance at the time they are
brought up by the service provider.
Summary of Contents for ipBTS C30
Page 2: ...ii 910136 Rev01 00 Standard July 2007 ...
Page 12: ...Contents xii 910136 Rev01 00 Standard July 2007 ...
Page 20: ...About this document Notes cautions and warnings 7 910136 Rev01 00 Standard July 2007 ...
Page 30: ...Chapter 2 l Planning Requirements 2 4 910136 Rev01 00 Standard July 2007 ...
Page 68: ...Chapter 4 l RN commissioning Updating node software 4 28 910136 Rev01 00 Standard July 2007 ...
Page 72: ...Chapter 5 l RN hardware components RN shelf components 5 4 910136 Rev01 00 Standard July 2007 ...
Page 78: ...Appendix A l Radio module specifications A 6 910136 Rev01 00 Standard July 2007 ...
Page 86: ...Appendix B l RMA process B 8 910136 Rev01 00 Standard July 2007 ...
Page 89: ...Airvana ipBTS C30 Installation and Commissioning Release 4 0 Backcvr ...