F
PLUMBING
F - 11
13. Remove the battery from your trailer and store in a cool dry place where there is
no danger of freezing. It is very important for optimum life of a battery to check it
periodically and to keep it fully charged.
14. Remove any items (food, cosmetics, etc.) from trailer interior that might be dam-
aged by freezing - or might damage the trailer if containers break.
For additional winterizing protection add a non-toxic antifreeze (approved for drinking
water system) to the water lines using the following procedure.
1. Reconnect all lines except the hose to the pump inlet port. Close all drain valves.
2. Turn water heater by-pass valves to the by-pass position. See Shut off Valves expla-
nation in this section.
3. Attach a length of hose to the pump inlet port. This piece of hose should be long
enough for the free end to be inserted into and reach the bottom of the antifreeze
container.
4. Dilute the antifreeze solution in accordance with the manufacturer’s instructions.
5. Open all water faucets.
6. Insert hose length into the antifreeze container, turn the pump switch on, and run the
water pump until the antifreeze solution fills all water lines. Flush toilet. Work hand
shower spray while holding down in tub.
7. Shut off the pump and close all faucets.
8. Disconnect the hose length from pump inlet fitting and reconnect water system
inlet line.
Water heater by-pass valves location:
16 Ft. and 22 Ft. unit are under the roadside wardrobe hinged bottom shelf.
19 Ft. is under the bed on the roadside through a hole cut in the bed top.
23 Ft. is under the bed and accessed through a hole cut in the bed top or through the
rear exterior access door..
25 Ft. Sleep six is through the curbside rear exterior access door.
25 Ft. Front Bed is through the curbside front exterior access door.
27 Ft. front bed model is under bathroom lavatory.
28 Ft. unit are under the roadside wardrobe, remove front panel for access.
Normal flow position is: shut off valve B - open valves A and C. In some models the
valves may be in a horizontal pattern or on top of the heater, rather than the vertical
shown in the illustration. Valve operating sequence will be the same. Open valve B and
close valves A and C to by-pass filling the water heater for winterizing. Valves may be
on top of water heater.
A
B
C
Hot
Cold
Summary of Contents for INTERNATIONAL CCD
Page 1: ...A TRAILERING GUIDE AIRSTREAM OWNERS MANUAL INTERNATIONAL CCD...
Page 6: ...INTRODUCTION 2008 INTERNATIONAL NOTES...
Page 23: ...B B 7 TOWING Notes...
Page 29: ...B B 13 TOWING NOTES...
Page 95: ...H H 6 APPLIANCES NOTES...