Setup and Test
95
Setting Up the Access Concentrator
The Access Concentrator is setup using Sitespan in stand alone mode and Netspan does not
need to be connected for the AC to be set up
Setting the TEI and Baud Rate for Netspan Connection
1. Connect PC using AS7030 SiteStart software to the LAT port on the front of the shelf
controller of the Shelf being commissioned..
2. Set the TEI to the value designated during system planning. The TEI number must be
unique to the Network managed by Netspan.
3. Set the Baud Rate for connection. The same rate must be set when setting up AC Shelf
Properties later in this commissioning process.
To commission the AC Shelf the Shelf must be connected via an RS232 interface to a
Sitespan server. However the settings made during the setup process must be transferred to
the NMS Netspan before it server is connected or values set within the shelf during this
process will be overwritten by Netspan when it is connected. Alternatively if Netspan is
available the setting up can be done using Netspan
Creating AC Shelf/Rack on Sitespan
1. Connect the Field Engineer Laptop to the AC shelf Sitespan port.
2. Run Sitespan Server software on the laptop.
3. Open Sitespan Client application.
4. Create the Server to make connection to (usually the name of the PC).
5. Connect to the Server.
6. Create Site.
7. Highlight the site, click right mouse button and select Create Child Element
8.
Select
Airspan AC Rack
9.
Highlight the rack in Object List, click right mouse button and select create
Airspan
DA AC shelf
10.
Select the position for the AC shelf.
11.
From the Object List, Shelf select the Access Concentrator, click right mouse button
and select
Element View
12.
Select AS4000 (DA) AC Shelf.
13.
Continue with '
Setting up AC Rack and Shelf Configuration'
below
Creating AC Rack and Shelf configuration on Netspan
1. Click the + sign on the 'Create Node' menu to show the sub menu items
2. Select AS4000 AC and click the left mouse button.
Summary of Contents for AS4000
Page 2: ......
Page 6: ...Printed Documentation 2 ...
Page 14: ...Printed Documentation 10 ...
Page 16: ...Printed Documentation 12 ...
Page 27: ...Installation 23 Typical 75ohm DDF Layout ...
Page 28: ...Printed Documentation 24 ...
Page 41: ...Installation 37 ...
Page 42: ...Printed Documentation 38 BNC Terminations to Coax ...
Page 43: ...Installation 39 Type 43 Terminations to Coax ...
Page 44: ...Printed Documentation 40 ...
Page 52: ...Printed Documentation 48 ...
Page 68: ...Printed Documentation 64 ...
Page 71: ...Installation 67 ...
Page 72: ...Printed Documentation 68 CT Rack Labelling Central Terminal Rack ...
Page 73: ...Installation 69 BNC Terminations to Coax ...
Page 74: ...Printed Documentation 70 Type 43 Terminations to Coax ...
Page 75: ...Installation 71 ...
Page 78: ...Printed Documentation 74 Card Insertion DA Rack Card Insertion Expansion Rack ...
Page 110: ...Printed Documentation 106 ...
Page 112: ...Printed Documentation 108 Combiner Shelf PSU ...
Page 133: ...Setup and Test 129 ...
Page 163: ...Setup and Test 159 ...
Page 166: ......
Page 170: ...Printed Documentation 166 ...
Page 176: ...Printed Documentation 172 ...
Page 192: ......