Preparatory Tasks
Installation Tools and Equipment
The following lists of tools and equipment are required to successfully install and test the
AS4000 Access Concentrator Racks.
Required Tools
Combination Spanners: 8 mm, 13 mm, 17 mm, & 19 mm.
Spirit Level: 18 inch.
Pozidrive: No 1 x 75 mm.
No 2 x 100 mm
;No 3 x 150 mm.
Screwdriver, flat blade: 3 mm x 100 mm.
Screwdriver, flat blade: 5.5 mm x 100 mm.
Screwdriver, flat blade: 8 mm x 150 mm.
Hammer, Ball Pein: 1lb.
Drill Bits, Masonry: 11 mm, 12 mm, 13 mm.
Ratchet Crimp Tool for red, blue and yellow insulated crimps.
Crimp Tool type 6A with VQ dies for co-ax connectors and optionally Type 43
connectors
Cordless Drill/Driver.
Required Equipment
Description
Recommended Model
Quantity
1
Digital Multimeter
Fluke 77 or similar
1
2
50 ohm Termination 15W
Suhner 6515.17.A
2
3
Test Lead for Management Port
Airspan proprietary item
1
4
RF Power Meter
Amritsu Sitemaster 400A or
Marconi 6970
1
5
Power Sensor
Amritsu 560-7N50B or
Marconi 6932
6
Sensor 30dB 5W attenuator for use
with Amiritsu Power Sensor
HP8491 N-type
1
7
DA Commissioning Unit and
associated cables
Airspan proprietary item
1
Site Readiness
Verify that the site is ready for the installation of the CT Racks.
This preparation will have been covered by a site survey conducted by Airspan Networks
or by a survey form completed by the customer. The survey will include a site plan of the
facility identifying the floor layout, power outlets, distribution boxes, and cabling runways.
A sketch showing the rack support arrangements showing the exact positions of the
mounting points on the rack with dimensions, and typical overhead ironwork provision
should be included.
Inspect the site, and particularly the equipment room, before unloading or unpacking the
equipment to ensure the following:
Summary of Contents for AS4000
Page 2: ......
Page 6: ...Printed Documentation 2 ...
Page 14: ...Printed Documentation 10 ...
Page 16: ...Printed Documentation 12 ...
Page 27: ...Installation 23 Typical 75ohm DDF Layout ...
Page 28: ...Printed Documentation 24 ...
Page 41: ...Installation 37 ...
Page 42: ...Printed Documentation 38 BNC Terminations to Coax ...
Page 43: ...Installation 39 Type 43 Terminations to Coax ...
Page 44: ...Printed Documentation 40 ...
Page 52: ...Printed Documentation 48 ...
Page 68: ...Printed Documentation 64 ...
Page 71: ...Installation 67 ...
Page 72: ...Printed Documentation 68 CT Rack Labelling Central Terminal Rack ...
Page 73: ...Installation 69 BNC Terminations to Coax ...
Page 74: ...Printed Documentation 70 Type 43 Terminations to Coax ...
Page 75: ...Installation 71 ...
Page 78: ...Printed Documentation 74 Card Insertion DA Rack Card Insertion Expansion Rack ...
Page 110: ...Printed Documentation 106 ...
Page 112: ...Printed Documentation 108 Combiner Shelf PSU ...
Page 133: ...Setup and Test 129 ...
Page 163: ...Setup and Test 159 ...
Page 166: ......
Page 170: ...Printed Documentation 166 ...
Page 176: ...Printed Documentation 172 ...
Page 192: ......