3. Installation
3
-
1
3.1 Transportation
When loading and unloading unit, be sure to use the lifting bail provided on the center of the unit top.
Never get under the unit which is suspended, because it is very dangerous.
When unit is transferred or moved from working site, be sure to place it on truck bed, and fasten it by
ropes at the front and rear hooks.
Be sure to put one set of chocks to fix its wheels firmly on the truck bed.
Never lift unit which is still in operation, or it could cause critical damage to each component or lead to
serious accident.
3.1.1
Lifting up
①
Before lifting the unit up, make sure to check the lifting
bail
“
2
”
for any crack and loosened bolts.
②
Connect the hook
“
1
”
of the crane or shackle with lifting bail
“
2
”
eye fitted at the top center of the unit, and make sure
that there is no person standing around the unit. Then
perform hoisting operation.
③
Use auxiliary ropes
“
3
”
to prevent the unit from swinging
and/or twisting, giving signs and signals each other.
④
Select a truck or a crane with capacity sufficient for weight
and size of the unit by referring to the values shown in
Chapter 8
“
Specifications
”
of the manual.
⑤
Never lift the unit while it is running, or this could cause a
serious accident.
3.1.2
Mounting the unit on the truck bed
Be sure to fasten the unit with ropes
“
1
”
as shown in the
figure right, and securely fix it on the truck bed.
Be sure to put one set of chocks
“
2
”
to the wheels. Pull the
parking brake lever it firmly after the unit is loaded on the
truck bed.
A030117
A010190
3
1
3
2
1 2 2 1
Transportation
Summary of Contents for PDSH850S-4B2
Page 1: ......