
S.A.P. / B,P,S&R– Installation Procedure
-3-
INSTALLATION OF PROBES
.
S.A.P./P – Pipe Mount
S.A.P./B – Electrical Junction Box Mount
The S.A.P./P is furnished with a 1/2" FPT signal connection which is also used for mounting.
The S.A.P./B is mounted into a standard 2x4 electrical junction box (provided by others).
SIGNAL TUBING
. Signal tubing may be 1/4" O.D. if the distance from the S.A.P. to the transmitter is 200' or less.