Air Knight TT-AK245-V2 Owner'S Manual Download Page 5

5

©2021 Carrier Enterprise • www.airknightiaq.com • 215458-00 Rev 1B 08/21

METAL DUCTWORK INSTALLATION

FIBERGLASS DUCTWORK INSTALLATION

•  Locate a suitable area of the duct 

for installation. Minimum 8" area. 
If needed, cut away insulation to 
expose metal duct. 

•  Mark location for 4" opening using 

the included mounting plate as a 
template. 

•  Cut opening for the device.

•  Remove the backing from the 

mounting plate gasket, center 
mounting plate over opening, and 
press onto the duct. The adhesive 
gasket will hold the mounting plate 
in place.

•  Secure the mounting plate using self-

tapping screws.

•  Insert device into opening and secure 

with knurled nuts.  
Note: Be sure airflow will pass in the 
proper direction as indicated by the 
arrow on the top of the core. (See 
fig.3)

•  Connect to proper power and test 

operation. The operation indicator 
light on the face of the device should 
be on.

For fiberglass ductwork installations, follow metal ductwork installation 
steps, but use 3" toggle bolts to attach mounting plate.  

WARNING

UV Light Hazard.

Can cause serious eye and skin 

damage.

Do not look at UV-C light. Wear UV-C 

eye and skin protection

Fig. 3 Cut opening in duct, attach mounting plate, and 
install device.

WARNING

Electric Shock Hazard.

Can cause injury or death.

Electrical wiring of the unit to the 

HVAC system should be done by a 

licensed HVAC technician or 

electrical installer.

Summary of Contents for TT-AK245-V2

Page 1: ...1 OWNER S MANUAL TT AK245 V2 5 MODEL TT AK249 V2 9 MODEL AIR PURIFICATION SYSTEM AIR KNIGHT...

Page 2: ...lts w Phillips Head 5 Butterfly Toggle Bolt Anchors 6 18 22 Gauge Wire Screw On Nuts 40Va Transformer Read all instructions carefully Failure to do so could damage the equipment or cause harm to yours...

Page 3: ...pply 2 yr cell TT AK245 V2 TT AKCELL 5 TT AK249 V2 TT AKCELL 9 6 5 H X 6 W X 11 75 L Specifications subject to change without notice As additional safety support the Air Knight product line has receiv...

Page 4: ...branch duct takeoffs 2 The ductwork around the installation area should be clean and dry to insure proper adhesion of the gasket materials and any tape used 3 An approximate 4 opening will need to be...

Page 5: ...Insert device into opening and secure with knurled nuts Note Be sure airflow will pass in the proper direction as indicated by the arrow on the top of the core See fig 3 Connect to proper power and te...

Page 6: ...V lamp in the same container you received your replacement to Air Knight Reclamation 1112 Industrial Drive Royse City TX 75189 For optimal performance replace the PX5 core w UV lamp 5 core TT AKCELL 5...

Page 7: ...he UV C lamp detach lamp from device and dispose of properly Secure the new core or new UV C lamp to the device Reverse the previous steps to return the device to operation WARNING UV Light Hazard Can...

Page 8: ...EXCEED DUST FREES AFFORESTATED OBLIGATIONS ARE HEREBY DISCLAIMED AND EXCLUDED FROM THIS WARRANTY SOME STATES DO NOT ALLOW LIMITATIONS ON HOW LONG AN IMPLIED WARRANTY LASTS SO THE ABOVE LIMITATION MAY...

Reviews: