background image

SECTION 4

Ducting

CAUTION: 

ALL DUCTING MUST COMPLY WITH LOCAL AND NATIONAL 

BUILDING CODES.

1.  Remove any tape that might be holding the damper in place. Connect the ducting to the 

fan’s duct collar 

(Figure 8)

 and secure in place using tape or screw clamp. Always duct 

the fan to the outside through a wall or roof cap.

SECTION 5

Wiring

CAUTION:

 MAKE SURE POWER IS SWITCHED OFF AT SERVICE PANEL BEFORE 

STARTING INSTALLATION.

WARNING:

 THIS UNIT MUST BE WIRED ON A SEPARATE 20 AMP CIRCUIT.

WARNING:

 

USE APPROPRIATELY SIZED COPPER CONDUCTORS ONLY RATED 

FOR AT LEAST 75°C.

CAUTION:

 ALL ELECTRICAL CONNECTIONS MUST BE MADE IN ACCORDANCE 

WITH LOCAL CODES, ORDINANCES, OR NATIONAL ELECTRICAL CODE. IF YOU ARE 

UNFAMILIAR WITH METHODS OF INSTALLING ELECTRICAL WIRING, SECURE THE 

SERVICES OF A QUALIFIED ELECTRICIAN.

1.  Using wiring carrying the appropriate rating, run a dedicated line on a 20 amp service 

from the main service panel to an approved wall junction box (not included). Once inside 
the junction box, split the hot (black) wire from the home and connect one end to each 
of the switches into the terminal marked “COMMON TERMINAL”. Connect the ground 
(green or bare copper) wire from the home to the junction box. The neutral (white) wire 
from the home is not connected to the switch or junction box, but will be run to the 
unit’s wire compartment. Use approved methods for all connections.

2.  Run wiring from wall switches carrying the appropriate rating. One neutral (white), one 

ground (green or bare copper), and four hot (black, red, blue, yellow leads connected 
to the switch, one for each function). Secure the electrical wires to the housing with an 
approved electrical connector. Make sure you leave enough wiring in the box to make 
the connection to the fan’s receptacles.

3.  Connect the white wire from the house to the four white wires from the fan. Connect 

one hot (black) wire from the wall switch to the black wire from the fan (this is the fan 
control). Connect second hot (red) wire from the wall switch to the red wire from the 
fan (this is the heat control). Connect the third hot (blue) wire from the wall switch to 
the blue wire from the fan (this is the main light control). Connect the fourth hot (yellow) 
wire from the wall switch to the yellow wire from the fan (this is the night light control). 
Connect the ground wire from the house to the green wire from the fan 

(Figure 9)

. Use 

approved methods for all connections.

www.airkinglimited.com

965 Rev. D 5-14

3 of 12

4.  Reinstall the wire compartment cover by sliding the tabs at the bottom of the cover into 

the slots in the housing. Make sure all wires are tucked inside of the compartment and 
are not being pinched or showing through. Reinstall the two screws removed in 

Step 3

 of 

SECTION 1

 

Preparing the Unit

 

(Figure 10)

.

SECTION 6

Completing the Installation

1.  Insert the plug from the heating unit into the receptacle marked“HEAT”, and the plug 

from the fan into the receptacle marked “VENT”( 

(Figure 11).

Figure 8

Hot (Yellow)

Figure 9

Hot (Blue)

White

Ground

Hot (Red)

Hot (Black)

Hot (Black)

Switch

Switch

Supply from house

Figure 10

Slot

Light

Tab

Figure 11

Vent

Heater

Summary of Contents for AK965

Page 1: ...fire related construction b For supply connections use wires suitable for at least 75 C 167 F c Use copper wire only d Sufficient air is needed for proper combustion and exhausting of gases through th...

Page 2: ...r Figure 3 SECTION 2 New Construction 1 Mounting Rail Installation Install the rails on the housing and position the housing next to the joist Line up housing so it will be flush with the finished cei...

Page 3: ...ral white one ground green or bare copper and four hot black red blue yellow leads connected to the switch one for each function Secure the electrical wires to the housing with an approved electrical...

Page 4: ...utilizes an automatic resetting limit control located on the heating element housing DO NOT tamper with this device SECTION 8 Maintenance Instructions CAUTION MAKE SURE POWER IS SWITCHED OFF AT SERVI...

Page 5: ...s to Air King for repair or replacement Air King will pay return shipping charges from Air King following warranty repairs or replacement ANY AND ALL WARRANTIES EXPRESSED OR IMPLIED INCLUDING WITHOUT...

Page 6: ...www airkinglimited com 965 Rev D 5 14 6 of 12 NOTES...

Page 7: ...t la construction relative aux incendies b Pour les connexions d alimentation utilisez des c bles adapt s au moins 75 C 167 F c Utilisez des c bles en cuivre seulement d De l air en quantit suffisante...

Page 8: ...des solives en utilisant les 4 traverses de montages fournies 5 Enlever l alv ole d fon able l aide d un tournevis plat Figure 3 SECTION 2 Nouvelle Construction 1 Installation des Traverses de Montage...

Page 9: ...interrupteurs muraux ayant la capacit appropri e Un neutre blanc un fil de mise la terre vert ou cuivre nu et quatre vivants fils noir rouge bleu jaune connect s l interrupteur un pour chaque fonctio...

Page 10: ...matique situ sur le bo tier de l l ment chauffant NE touchez PAS ce dispositif SECTION 8 Instructions d entretien ATTENTION VOUS ASSURER QUE L ALIMENTATION EST COUP E AU PANNEAU DE SERVICE AVANT DE CO...

Page 11: ...tion d abus de mauvaise utilisation de r paration faite ou tent es non autoris es Cette garantie ne couvre pas les co ts d exp dition pour le retour des produits Air King pour la r paration ou le remp...

Page 12: ...www airkinglimited com 965 Rev D 5 14 12 of 12 NOTES...

Reviews: