5
Product Overview
Setting Up
Step 1:
Place the machine on a flat surface and in a suitably large area with at least 50 cm open
space at each side of the machine and 2 meters for the output direction of the machine.
Step 2:
Fill the fluid tank with Air Guard fluid.
Step 3:
Connect the machine to suitably rated power supply. To determine the power requirement
for the machine refer to the label on the back of the machine.
Always connect the machine to a protected circuit and ensure it is properly
grounded to avoid risk of electrocution
.
Step 4:
Turn on the power switch. Once powering up the machine, it takes approximately
6 minutes
to complete the warming-up process to make heater reach operating temperature to work.
LCD control panel
Wireless Receiver (antenna)
Power Switch
Breaker
Power Inlet
Fog Output Nozzle
Summary of Contents for AG-1600
Page 1: ...1 AG 1600 Antibacterial Vaporizer USER MANUAL ENGLISH ...
Page 2: ...2 ...