AIR GAP AG250-002 Instruction Download Page 2

2 – #8  Mounting Screws

2 – Support Bushings

1 – Hot/Cold Water Valve

Installation Procedures

AG250-002

LIST OF PARTS ENCLOSED

The  AG250-002, in combination with
AG250 series foot pedals, provides
hands free faucet operation. Pedals are
ordered separately. Select from the
following three  foot pedals;
AG250-103, AG250-203 or AG250-303.  

Please read the instructions once through before starting.

VALVE INSTALLATION INSTRUCTIONS

-OVER-

FIG. 1

2 – Block and Brick Wall Anchors

2 – 30"   Water Supply Hoses, connector 3/8"COMPR. x 1/2"FIP

2 – Drywall Twist In Lock Anchors

Dual Mechanical
Water Valve

1/2" Inlet Port 
x2

 3/8" Outlet Port
 x2

Support
Bushing
x2

#8  Mounting
Screws
x2

Actuator
Cable

Anchor
(shown drywall
type)
x2

Water Flow
Direction
Arrow Up

To Water
Supply

To Faucet

Connect to
the Pedal

Before mounting the AG250-002 make sure that water is turned off.
Disconnect hoses (hot and cold water) between the faucet and
water supply. 

1.

Mark  position of the holes for mounting valve on the wall. Install
provided anchors (drywall type or block/brick type ) into the wall.

2.

Mount the AG250-002 valve to the wall with the water flow direction
arrow pointing up. Use supplied bushings and screws (use 6mm/
1/4"  drill) to mount valve.

3.

Connect valve's outlet ports to hoses from the faucet.

4.

Connect the water supply houses to inlet ports with provided 30"
hoses.

5.

During the installation process, make sure not to kink valve's
actuator cable.

6.

While connecting hoses to the valve, use minimum force to tighten
the nut in order to prevent  port adapter from rotating.

7.

Connect actuator cable to the pedal (see Fig. 2). Keep actuator
cable as straight as possible, avoiding unnecessary bends.

8.

Turn on water supply and check for leakage.

9.

Press the pedal, open the faucet, and adjust it to the desired water
temperature and flow rate.

10.

As long as the pedal is depressed, water will flow from the faucet.

11.

When the pedal is released, the water flow stops.

12.

AG250-103

AG250-203

AG250-303

AG250 Series Foot Pedals

Kitchen pedal with

constant flow lock

Kitchen / bathroom

pedal 

Kitchen / bathroom

floor mounted pedal 

Summary of Contents for AG250-002

Page 1: ... 002 Unscrew the front nut 1 and insert the cable 4 through the slot cable support bracket See pedal instructions for more details and exact slot location The rear nut 3 remains at the end of the thread 2 Adjust cable holder 2 for proper pedal operation and secure it s position with nuts 1 and 3 Use 3 32 wrench for tightening nuts M5x0 8mm 1 VALVE TO PEDAL CONNECTION SEE FIG 2 Verify that the actu...

Page 2: ... holes for mounting valve on the wall Install provided anchors drywall type or block brick type into the wall 2 Mount the AG250 002 valve to the wall with the water flow direction arrow pointing up Use supplied bushings and screws use 6mm 1 4 drill to mount valve 3 Connect valve s outlet ports to hoses from the faucet 4 Connect the water supply houses to inlet ports with provided 30 hoses 5 During...

Page 3: ...opyright 2018 AIR GAP INTERNATIONAL During installation avoid bending valve actuating Any bending needs to be smooth CAUTION AG250 103 Press the pedal on right side to lock in open position open the faucet and adjust it to the desired water temperature and flow rate As long as the pedal is depressed water will flow from the faucet When the pedal is released the water flow stops 4 To release the pe...

Page 4: ...chanical Valve 1 Top mounting plate Pass cable from the AG250 002 valve through the 1 opening under the cabinet plate and connect it to the pedal AG250 103 2 Unscrew the front nut 1 on the valve cable and insert the cable 4 through the slot on the back side of support bracket AG250 103 pedal The rear nut 3 remains at the end of the thread 2 Adjust cable holder 2 for proper pedal operation and secu...

Reviews: