HYDRO-AIRE SERIES PRESSES
INSTALLATION, OPERATION, AND MAINTENANCE
14
5.1 Air Venting/Adding Oil Procedure
(continued)
6.
Attach ¼” Poly
-flow line from AIM Joraco Oil Pump HP-
100F to the bleed valve (P3)
*See Figure 2*
7.
Turn screw on bleed valve (P3) counterclockwise until it
stops (valve open)
8.
Begin pumping oil from AIM Joraco Oil Pump
–
HP-100F
(some force may be required)
9.
Continue pumping oil until it begins to flow out of the vent
hole and is free of any air bubbles
10.
Wait 30 minutes to allow any remaining bubbles in the oil
to escape, then repeat step 8
11.
Turn screw on bleed valve (P3) clockwise until it stops
(valve closed)
12.
Wipe any excess oil from the cylinder tube making sure
the area around the vent hole is clean and dry
13.
Replace venting plug screw and hand tighten lightly
14.
Remove AIM Joraco Oil Pump
–
HP-100F from bleed valve
(P3)
15.
Cylinder is ready for operation