Terminal box
Electric cover
Unit
Unit
Hook
Drain tank
Air filter
Install the terminal block cover
Fix the unit
1.Install the air filter
2.Install the drain tank
www.zjaike.com
4
Professional Hand Dryer Manufacturer
ZHEJIANG AIKE APPLIANCES CO.,LTD
丨
0086-0576-8
6089873
丨
[email protected]