Doc
No.
FM5611
issue
C
Page
7
6.
INSTALLATION
The
Maxpage
Terminal
requires
a
power
and
data
connection;
power
is
taken
from
the
12V/3A
battery
backed
PSU
and
data
comes
from
the
Pager
Port
on
any
Touchsafe
Pro
Display
Panel.
POWER
SUPPLY
UNIT
Undo
the
single
lid
fixing
screw
and
open
the
lid.
Note:
if
the
lid
is
removed
ensure
the
Safety
Earth
is
re
‐
connected.
Position
the
PSU
within
2
metres
of
an
un
‐
switched
13A
mains
socket.
Fix
the
power
supply
unit
to
the
wall
using
the
3
holes
“
A
”
as
shown
below.
Connect
the
mains
lead
provided
to
the
power
supply
unit
mains
terminals
using
the
colour
code
in
the
table
below.
Note:
the
plug
is
fitted
with
a
240V
AC
5A
BS1362
fuse.
The
PSU
should
only
be
opened
during
installation
and
service
–
the
lid
must
be
screwed
shut
at
all
other
times
to
prevent
the
risk
of
electric
shock.
Never
leave
a
live
PSU
unattended
with
the
lid
open.
LOW
VOLTAGE
LEAD
Cut
the
socket
(female)
connector
off
one
end
of
the
DC
extension
lead
provided
in
the
kit.
Strip
‐
back
the
insulation
and
connect
to
the
PSU
using
the
colour
code
in
the
table
below.
Plug
the
lead
into
the
12V
DC
socket
on
the
rear
of
the
Maxpage
Terminal.
Mains
Connection
Colour
Terminal
Brown
L
Blue
N
Green
/
Yellow
E
160mm
65mm
145mm
A
A
A
12V/3A
Boxed
PSU
E
N
L
O/P
+
‐
Cut
Socket
off
Lead
Plug
into
Maxpage
Terminal
1.5m
Lead
12V
DC
Connection
Colour
Terminal
White
12V
Screen
0V