
20
Chapter 2. Hardware Setup
SB101-SP User Manual
6. Pull out the middle channel until the ball bearing retainer is locked forward.
NOTE
Verify ball bearing retainer is locked forward.
7. Slide the release tab and push barebone into rack. Make sure the barebone is
completely installed onto the rack.
11
12
This information is provided for professional technicians only.