Installation-, Operating-, Maintenance-Manual, Spare Part List
BCR03
AGT-PSG GmbH & Co.KG
Errors and printing mistakes excepted
Page 8
Translation - Manual BCR03 Rev. 7/2017
Assembly and Installation
Feed Lines
All operations mentioned below to be performed by qualified personnel only.
As a standard, medium connections of the sample gas cooler have been designed for a 6/4mm hose. The
sample gas cooler is equipped with exactly one heat exchanger (PVDF, glass or SS316) and provides 1-2
gaspaths. The following feed lines must be connected:
Sample gas pipelines to the gas inlet connections
Analyzers to the gas outlet connections
Condensate pumps/tanks to the condensate outlet connections
Marking
Gas inlet
Marking
Gas outlet
Condensate inlet GP1/2
Condensate outlet GP1/2
Gas outlet GP1/2
Condensate inlet GP3/4
Condensate outlet GP3/4
Gas outlet GP3/4
The feed lines of the numerous possible heat-exchanger types (material PVDF/glass/SS316,
construction mono/dual, condensate connection top/bottom- see chapter “Technical Data”) may
have different designs. The picture above shows two SS316 dual-HEs with condensate
connections on the top.