AG-tronik M1 AND REGULATOR PR-9
INSTRUCTIONS FOR USE – rev. 2017-04
15
valve is closed, mixing through mixing nozzle does not occur (unless the mixing is
done through the mixing pump). Ensure appropriate pressure of 2-10 bar.
If required, reset daily counters (ha, km, l).
8.2. Spraying
Before taking off, check minimum speed (chapter 9.9) and adjust it, if required
.
Turn on
section valves
and move to starting point of spraying. Check
that automatic protocol is on and begin spraying
.
When driving off, engage the central valve
and AG-tronik ensures that you
achieve the set liter per hectare in the least time possible. If the minimum speed is adjusted
properly (see chapter 9.9 General settings; minimum spraying speed), AG-tronik ensures
automatic opening and closing of the main valve on the regulator. At the end of the line, when
you reduce driving speed under minimum set speed, it automatically closes central (MAIN)
valve and reopens it when spraying speed exceeds minimum set speed.
Buttons for distribution valves are independent of MAIN valve and can be opened or closed,
when the MAIN valve button is off. Valves open in connection with MAIN valve and open and
close in relation to position of MAIN valve button.
8.3. After spraying
After spraying, make sure that all vital parts of the regulator are adequately washed with
clean water as soon as possible!
The instructions for use of the sprayer have described a
process for the cleaning and partial purification device. To clean it, it only takes a few
minutes and at the same time reduces the likelihood of blockage in the vital parts of the
regulator.