Installation Planning Guide
7
Introduction
The
Installation Planning
guide assists the customer in selecting and preparing a site to
install a Varian
MERCURY
Vx Works-Powered NMR spectrometer system (shortened to
MERCURY-VX
throughout this manual), including preparing the computer system. Using
the predelivery and postdelivery checklists provided and following the information
presented in this guide should bring about a smooth transition from delivery to installation.
This guide contains the following chapters:
•
describes how to prepare for system delivery and
provides shipping dimensions and weights for NMR system components.
•
Chapter 2, “Site Requirements,”
lists the factors to consider when selecting the
installation site.
•
Chapter 3, “Site Preparation,”
describes the many factors to consider—electrical,
cooling, safety, supplies, and so forth—when preparing the installation site.
•
Chapter 4, “Installation Supplies,”
discusses the required and recommended supplies
for the system installation.
•
Chapter 5, “Stray Magnetic Fields,”
provides magnetic field safety data and shows
stray field plots for each magnet system.
•
Chapter 6, “NMR Room Layouts,”
provides help in laying out the system room.
Safety Precautions
Throughout this guide are important warnings and cautions that you should read and follow
carefully. These safety precautions have the following format and meaning:
WARNING:
Warnings
are used when failure to observe instructions or precautions
could result in injury or death to humans or animals,
or significant
property damage.
CAUTION:
Cautions
are used when failure to observe instructions could result in
permanent damage to equipment or loss of data.
Importance of Communication
In planning the system installation, good communications are essential between the
customer, the facility planner or architect, and Varian on a frequent basis. Any questions or
problems must be addressed immediately to avoid delays and additional costs.
One person from the customer’s institution should be appointed to coordinate site planning
and preparation. This person should represent all users of the system in dealing with Varian
and the facility planner or architect.