Installation Note N5230-90022 11
Step 4. Remove the Test Set Deck Front Panel
Refer to
for this procedure.
1. Disconnect the wrapped wire cable (item
①
) from the front-panel LED board.
2. Using a T-10 TORX driver, remove eight screws (items
❶
through
❽
) from the test set
deck front panel, to release it.
3. Remove the test set deck front panel from the analyzer, with the LED board and both
couplers attached.
4. Remove the LED board from the front panel by removing the three attachment screws.
Retain the LED board and the screws for installation on the new front panel.
5. Using a 1-inch wrench, remove the flange nut (item
②
) from each coupler. Retain the
flange nuts for installation of the new couplers. Discard the front panel and the couplers.
Figure 6
Test Set Deck Front Panel Removal
Summary of Contents for N5230AU-974
Page 13: ...Installation Note N5230 90022 13 Figure 8 20 GHz Top to Bottom Cables Removal Top...
Page 15: ...Installation Note N5230 90022 15 Figure 9 20 GHz Components Removal...
Page 17: ...Installation Note N5230 90022 17 Figure 10 50 GHz Components Installation...
Page 19: ...Installation Note N5230 90022 19 Figure 12 50 GHz Top to Bottom Cables Installation Top...
Page 23: ...Installation Note N5230 90022 23 Figure 15 50 GHz Bottom Cables Installation...