38
Installation Manual
2
Installation (Getting Started)
Operation Checks on Delivery
The following procedures give a quick power-up and back-to-
back functional test of the optical interfaces using the optical
accessories provided. These checks should be performed by a
user or engineer familiar with making optical interface
connections.
1
For information on how to use the instrument and navigate
the graphical user interface, refer to the
Quick Reference
Guide
(supplied with the instrument and also available on
the CD-ROM).
2
Connect the OmniBER OTN to the AC Power Line using the
power cord provided and set OmniBER OTN power switch
ON (located beside power inlet).
3
The fans should start and after a few seconds the display will
initialize and indicate the following.
Starting Instrument
Please wait.......
The Agilent Technologies splash screen will then be
displayed while the unit completes initialization.
4
On completion (approximately 90 seconds), the display will
change to the user windows with instrument settings. The
instrument is now ready for use.
C A U T I O N
Safety precautions, care and connection cleanliness must be observed
to ensure that the optical connections are not damaged or degraded.
Ensure the recommended optical attenuation is present in all optical
loopback connections as failure to do so could cause test failure or
damage to the optical receivers.
NEVER CONNECT THE OPTICAL OUTPUT DIRECTLY TO OPTICAL
INPUT WITHOUT ATTENUATION AS THIS WILL EXCESSIVELY
OVERLOAD THE RECEIVER AND COULD CAUSE DAMAGE.
To power-up the instrument
Installation.book Page 38 Monday, January 12, 2004 1:13 PM