Agilent Intuvo 9000 GC Installation
A
Making Swagelok Connections
7
Mark the nut with a pencil line (see
).
Figure 20
Marking the fitting
8
For 1/8-inch Swagelok fittings, use a pair of wrenches to
tighten the fitting 3/4 of a turn (see
).
Figure 21
Final tightening
9
Remove the plug from the fitting. To connect the tubing, with
nut and ferrules, to another fitting, finger-tighten the nut,
then use a wrench to tighten it 3/4 (1/8-inch fittings) of a
turn.
10
Both correctly- and incorrectly-swaged connections are
shown in
. Note that the end of the tubing in a
correctly-swaged fitting is not crushed and does not interfere
with the action of the ferrules.
Figure 22
Completed fitting
Pencil line
Summary of Contents for Intuvo 9000
Page 1: ...Agilent Technologies Agilent Intuvo 9000 Gas Chromatograph Installation and First Startup...
Page 6: ...6 Agilent Intuvo 9000 GC Installation...
Page 25: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 25 3 Reinstall the GC covers...
Page 27: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 27 Turn on the GC...
Page 29: ...Installing the GC 1 Agilent Intuvo 9000 GC Installation 29...
Page 84: ...84 Agilent Intuvo 9000 GC Installation 1 Installing the GC 8 Close the GC front door...
Page 114: ...Agilent Technologies...