
Agilent G3440-68011 Micro Electron Capture (µECD) 3rd Detector
Installation Instructions
19
4
Remove the protective caps from the EPC module.
5
Install a 1/8-inch brass nut and ferrule set onto the other 3rd
μ
ECD gas
supply tube and connect this end of the 3rd
μ
ECD gas supply tube to the
μ
ECD manifold as shown in
.
Figure 25
Complete EPC tubing connections
6
Install the swagelok nut, back ferrule, and front ferrule from the bulkhead
union onto the 3rd
μ
ECD gas supply tube as shown below and gently bend
the tubing as needed into the shape shown in figure
and
. The tubing should have bends with a radius > 1 cm and should
not extend out from the EPC module beyond the box assembly frame.
Anode purge and makeup gas fitting
Tubing
Front ferrule
Back ferrule
1/8-inch
Swagelok nut