Maintaining Capillary Columns
Preparing the column installation to the CFT fitting
40
Maintaining Your GC
Figure 7.
Thread the column through the internal nut, ferrule, and swaging tool
4
Insert the column into the swaging tool until it bottoms.
5
Thread the internal nut into the swaging tool until finger tight. See
Figure 8.
Thread the internal nut into the swaging tool
6
Begin to swage the ferrule to the column using a 1/4-inch open-ended wrench.
The design of UltiMetal Plus Flexible Metal ferrules reduces the probability of column
breakage and minimizes the damage to the thread of the corresponding fittings.
Unlike other ferrule designs, a reliable leak-free seal is best made by tightening the
internal nut to a recommended number of degrees, not by applying more force. Applying
excessive force will not provide a better seal. Also, compressing the flexible ferrule less
minimizes damage to fittings.
To swage the ferrule to the column:
a
Find your ferrule type in
and note the range of degrees to tighten the internal
nut.
b
Tighten the internal nut clockwise to the lower end of your ferrule’s range.
c
Check if the ferrule is gripping the column. If yes, stop. If not, continue to tighten the
internal nut in small 5- to 15-degree increments. Check after each increment to see if
the ferrule is gripping the column. Stop as soon as gripping occurs. See
Summary of Contents for 8890
Page 1: ...Agilent 8890 Gas Chromatograph Maintaining Your Gas Chromatograph GC ...
Page 8: ...8 Maintaining Your GC ...
Page 22: ...2 Removing Covers To Remove the Electronics Cover 22 Maintaining Your GC ...
Page 142: ...8 Maintaining the MMI To Bakeout Contaminants from the MMI 142 Maintaining Your GC ...
Page 178: ...10 Maintaining the VI To Bakeout Contaminants from the VI Inlet 178 Maintaining Your GC ...
Page 208: ...12 Maintaining the TCD To Bakeout Contaminants from the TCD 208 Maintaining Your GC ...
Page 240: ...14 Maintaining the ECD To Bakeout the ECD 240 Maintaining Your GC ...
Page 264: ...16 Maintaining EPC Modules Installing or Replacing Frits in the PCM 264 Maintaining Your GC ...
Page 276: ...17 Maintaining a Valve To Install the Upper Valve Box 276 Maintaining Your GC ...