Site Preparation/Installation Checklists
7-7
Hospital Representative Checklist
Prior to Installation
Building
___
Route from receiving dock to system site can accommodate
equipment (ceilings, stairways, corridors, elevators, and so
on).
Area Layout
___
Floor plan has been established and permits access to
equipment for service and operation.
___
Storage area is available for manuals, accessories, and
consumables. Contact your local Agilent representative for
space requirements.
Environment
___
Floor can support equipment.
___
Ventilation or air conditioning maintains ambient
temperature between 5° C and 30° C (41° F and 86° F) at
less than 80% relative humidity.
Electrical Power
___
Power distribution type has been established and proper
receptacles provided. Proper hospital grade connector has
been selected and Agilent representative notified of selection.
___
Grounding precautions have been taken.
___
A separate circuit, capable of handling present and future
loads, has been installed.
Miscellaneous
___
Review definition of Care Units, bed labels, and tuning
ranges with hospital personnel.
___
Variable length cables have been measured and specified
with related labels.
___
Conduit and outlet box installation has been planned and
completed.
___
Sufficient consumables have been ordered.
___
Bedside station, remote area, and Patient Information Center
instrument mounts have been planned/installed.
___
Plywood panel has been installed at the ACC site location, if
mounting unit on the wall or access to 19”
telecommunications rack if rack mounting unit.
___
Operator training for medical personnel has been scheduled.
Summary of Contents for 78581B
Page 46: ...ACC Maintenance 4 2 ...
Page 54: ...Installation Responsibilities Customer and Agilent Technologies 6 4 ...
Page 90: ...Procedures 8 28 ...
Page 98: ...Contacts 10 6 ...