
240
Programmed Temperature Vaporization Inlet (PTV)
Replacement procedures
16 of 46
Jun 2001
Agilent 6890 Gas Chromatograph Service Manual
7.
Disconnect the power cable, thermocouple connector, and cryo connector
from the flow module and board. Disconnect the module ribbon cable
from the pneumatics board.
8.
Slide the flow module out of the chassis, remove the chemical trap
assembly from the mounting bracket, and remove the PTV assembly from
the GC.
9.
Removing the entire PTV assembly.
10. Replace the PTV assembly and flow module and re-assemble in reverse
order.
Replacing the PTV with cooling assembly
The PTV with cooling assembly, shown in Figure 240-10, is generally the
lowest level replacement part.
Figure 240-10
PTV with cooling assembly
1.
Turn off the inlet and allow the inlet to cool.
Summary of Contents for 6890 Series
Page 1: ...6890 Series Gas Chromatograph Service Manual ...
Page 2: ...6890 Series Gas Chromatograph Service Manual ...
Page 27: ...24 of 24 Jun 2001 Contents Contents Agilent 6890 Gas Chromatograph Service Manual ...
Page 29: ......
Page 39: ......
Page 207: ......
Page 391: ......
Page 459: ......
Page 493: ......
Page 521: ......
Page 523: ......
Page 580: ...900 Remote Access Remote Access information was not available for this printing ...
Page 581: ......
Page 583: ......
Page 631: ......
Page 677: ......
Page 737: ......