BU-0101704 R3
47
Figure 37.
Fasten Discharge Flighting onto Underfloor Auger Flighting
4. Push the underfloor flighting all the way back into the underfloor auger, ensuring that the opposite end of
the flighting is securely fitted onto the flighting coupler connected to the lower gearbox shaft in the center
sump (see
Æ
5.
For a Westeel or Twister bin:
If not done so already, remove the dust seals, six #14 x 1/2” self-tapping
screws, and control cover (see
6. Mount the powerhead (14) onto the underfloor auger (15) with eight 7/16” x 1-1/4” bolts (16) and nylon
locknuts (13) (see
11
10
12
13
11
10
12
13
EASYFLOW2 (100 SERIES) – FARM TUBE BIN UNLOAD SYSTEM