P1512161 R0
47
Install the Boot Base
1. Position the hopper base (4) on top of the hopper.
2. Secure the hopper base and the rubber flashing to the hopper using 3/8" x 1-1/2" bolts (6), 3/8" flat
washers (9), and 3/8" locknuts (7).
3. Attach the swivel base (2) to the hopper base (4) using hopper base tabs (1), 3/8" x 1-1/2" bolts (6), and
3/8" locknuts (7). See
Table 17.
Hopper Base Components
Item
Description
Quantity
1500
2000
2400
1
Hopper Base Tab
4
4
4
2
Swivel Base
1
1
1
3
Swivel Top
1
1
1
4
Hopper Base
1
1
1
5
Bolt Hex 3/4" x 2"
4
4
4
6
Bolt Hex 3/8" x 1-1/2"
8
11
13
7
Nut Nylock 3/8"
8
11
13
8
Nut Nylock 3/4"
4
4
4
9
Flat Washer 3/8" USS
11
11
13
10
Swing Belt Shield
1
1
1
11
Bolt Hex 1/2" x 1-1/2"
4
4
4
12
Nut Nylock 1/2"
4
4
4
Figure 38.
Installing Swivel Base
4. Attach the swivel top (3) to the swivel base (2) using 3/4" x 2" bolts (5) and 3/4" locknuts (8). See
SWING AWAY CONVEYOR – PORTABLE GRAIN BELT CONVEYOR