Step 7:
Cut a hole in the ceiling above the rangehood
to enable the flexible ducting and power
cables to pass through easily.
Be sure not to make the hole bigger than the
flue cover.
The hole will need to be big enough to be
able to pass the power cables though to the
ceiling.
Step 8:
Installing the solid ducts
For this step you will need to mark out where
the ducting is to pass through the roof.
Make sure that when marking out the location
of the ducting it is next to a beam (for support)
With the location of the ducting confirmed cut
the hole out in the roof to enable the ducting
to pass through the roof leaving 250mm
outside the roof.
Screw the ducting into a beam for support.
Install the flue support bracket to the beam
and screw to the duct. (Refer figure 5 / 6)
Repeat for the second duct.
Please leave a minimum gap of 500mm
between the solid ducts. (Refer figure 7)
AGF Professional 1500
PAGE 4
Step 7
Figure 5
BEAM
Figure 6
Figure 7