Chapter 2: 6' Peak Handrail Kit Installation
18.Install the stringer splice plates (15) over the seam of the transition plate (9) and the stair stringer
using 5/16" flange bolts (20) and 5/16" flange nuts (23).
NOTE:
Make sure the bolt (20) heads are to the inside of the walkway.
Figure 2-14
Installing the stringer splice plates
19.Install the stair handrail posts (13) to the transition plates (9) at the step location using 5/16" flange
bolts (20) and 5/16" flange nuts (23).
NOTE:
The bolt (20) head must be installed towards the walking area.
Figure 2-15
Installing the stair handrail posts
PNEG-2041
6', 10' and 14' Peak Handrail Kits
21