
3. Installation
PNEG-2339
Flex-Flo Unloader Kit
13
Installing the New Boot and Transfer Plate
NOTE:
Installation of the boot is the same whether the tank has the standard collar or the Sure-Flo Feed
Flow Control.
1. Slide the boot (27) as far as possible into the tank collar (32) or the Sure-Flo Feed Flow Control
opening.
Figure 3G Inserting the New Boot into the Collar
2. Align the boot (27) with the Flex-Flo system that will be installed.
3. Using the holes in the tank collar (32) as a guide, drill eight 11/32" holes (21) into the boot (27) rim.
Figure 3H Drilling Holes in the New Boot
Ref #
Description
27
New Boot
32
Tank Collar
Ref #
Description
21
11/32" Field Drill Hole
27
New Boot
32
Tank Collar