General Information
01-10
79024230 A Rev.
Bolts and Nuts
Special bolts are installed at several locations, so be sure
not to interchange them with other bolts.
Bolts and nuts should be tightened to their specified
torque with a torque wrench.
When locking the bolts or nuts with wire or a lock washer,
be sure to wind the wire paying sufficient attention to its
winding direction and bend the lock washer for secure
locking.
When locking bolts and nuts with an adhesive, apply the
adhesive on the thread and tighten securely.
Apply an adhesive (THREE BOND TB 1104) to parts
through which there is any possibility of oil leaks, such as
stud bolts and tapped-through parts.
Each lock nut must be tightened securely.
When tightening bolts and nuts, refer to the tightening
torque table.
Grease Fittings
After installation, each grease fitting should be filled with
grease.
When installing grease fittings of types B and C, be sure
to turn the fitting tips in a direction that will provide easy
access for a grease gun.
Other Precautions
Be sure not to damage any finished surfaces or parts.
Always refrain from forcing installation.
Each lever knob should be installed coated with an
adhesive (SUPER THREE CEMENT TB1702).
Each contact surface should be coated with an adhesive
(THREE BOND TB1215) and tightened evenly with bolts.
Adhesive coated surfaces should be installed within 30
minutes after application of the adhesive.
Precautions for applying adhesives:
•
The surface or the thread where and adhesive is to
be applied should be completely free of chips and oil.
•
The surface or the thread where an adhesive is to be
applied should be completely free of any oiliness.