- 4 -
Positioning the MR360R for excavating
MR360R with clamps:
The beam of the shovel must equipped with a
support (tube of
∅
40 mm and length 100 cm
minimum) be assembled and welded onto
mounting feet to 150 cm of the beam. You can
also use our magnetic medium SM400 (in
option) which will allow you a fast assembly, or
to change shovel into a few minutes.
- Using your rotary laser and of its cell of
manual reception, to dig and determine the
sub grade of your earthwork.
-
To position the beam vertically and to pose
the dish of the cup at the coast previously
given
.
-
You can carry out your earthwork: to take your
points of control, it will always be necessary to
vertically position your beam and your cup flat
(in the initial position of your adjustment)
MR360RA (magnets):
The MR360RA avoids the assembly of a
support on the beam of the shovel, but the
adjustment on the central indicator is more
difficult to carry out because of the power of the
magnets. It is thus advised to show the laser
on a tripod with toothed rack in order to more
easily regulate the beam on the central
indicator of the cell.
- The remainder of the procedure will remain
identical to the MR360R with clamps.