Page 2
Attach the (2) Hose Wraps to the top of the tank with
(4) Phillips Head Screws
Thread Pressure Gauge into open port on manifold., as
shown.
Thread Multi-Lid on to tank.
With the unit in a UTV Box, slide the boom mount tubes in to
the tank mounts and tighten the lobe knob.
* Secure tank using tie-down straps (NOT INCLUDED)
Slide the boom clamps up the boom mount tubes and install
the 1/4” carriage bolt and Lobe Knob., make sure the boom
clamps are installed with the square carriage bolt holes or
two boom mount holes to the inside and the lobe knob to the
outside.
Step 1
Step 2
Step 3
Step 4
To install a boom (not included):
Using U-bolts and nuts, attach the boom to the boom clamps.
Finally attach your boom feeder hose. Slip (2) hose clamps onto the hose. Attach one end of the hose to the boom and
the other end to the manifold.
Once fully assembled, to remove the sprayer from a UTV Box, disconnect the boom supply hose from the manifold, us-
ing the quick connect fitting. Then loosen the two lobe knobs on the tank mounts and slide the boom out and set aside.
Then the tank can be removed and set on the ground without damaging the tank or boom. The handles can be used to
lift the empty tank in and out of the box. Tie down straps can be installed through the handles to secure the tank.
Summary of Contents for FSUTV-45-12V
Page 8: ...Page 8 Notes...