background image

Page 5 

 

Step 5 

Step 6 

Assembly Procedure (FS-ATV-25BL) 

Manifold 

5167031 

1/4” FPT 

*** The Sprayer should now be ready for use *** 

After  your  boom  is  attached,  locate  the  48”  hose  and 
the (2) hose clamps from the parts bag. 
 
Place  the  hose  clamps  over  each  end  of  the  hose 
loosely. Slip the ends of the hose over the hose barbs 
on both the manifold and on the center nozzle. Use a 
twisting motion, if necessary, to get the hose fully onto 
each  barb.  Bring  the  hose  clamps  to  the  connection 
point and tighten securely. 
 
NOTE: 
Make sure this boom feeder hose does not end up on 
the  ‘outside’  of  the  spray  wand  hose,  otherwise  un-
wrapping  the  spray  wand  hose  from  around  the  tank 
may be difficult. 

Detail A:  Install the pressure gauge. Hand tighten  
 

 

 

securely. 

** DO NOT OVER-TIGHTEN ** 

 
Detail B:  Screw the lid onto the tank. Place the end of  
 

 

 

the lanyard through the tab in the tank. This 

 

 

 

is so the lid can ‘hang’ off the tank when  

 

 

 

filling/rinsing the tank out. 

 
Detail C:  Locate the (2) clips and (2) phillips head 
 

 

 

machine screws from the parts bag. 

A phillips head screwdriver is required for this step 

Place a screw through the hole in the clip and bring it 
up  to  the  tank,  where  the  embossments  for  the  clips 
are  (located on the rear side of the tank) 
Secure  the  clip/screw  to  the  tank.  Tighten  so  that  the 
clip is secure. Do this for each clip. 

 

 

 

 

 

** DO NOT OVER-TIGHTEN **

 

The spray wand will snap into the clips once installed. 
Do  not  use  excessive  force  when  placing  the  spray 
wand  into  the  clips,  as  this  could  cause  the  clips  to 
break. 

Lid 
Lanyard 

Lanyard 

Connection 

Tab 

DETAIL B 

DETAIL C 

DETAIL A 

5053112 

5117334 

Summary of Contents for FS-ATV-25BL

Page 1: ...The purpose of this manual is to assist you in operating and maintaining your lawn garden ATV sprayer Warranty Retain a copy of your receipt for your unit as it will be required to validate any warran...

Page 2: ...er s carton FS ATV 25 BL 3 8 5301406 Contents of Parts Bag 5278370 Contents of Bracket Kit 5278289 Wet Boom Sub Assembly 5275712 Lid w Lanyard 5058188 Owner s Manual Tank Plumbing Pre Assembly End Noz...

Page 3: ...ver and position it so that the cam handles which extend beyond the back of the tank are facing you and just hanging over the edge of the table or flat surface you are assembling this on Secure the bo...

Page 4: ...placement End Nozzle Assembly Procedure For Boomless Wet Boom Your boom will come with the 2 end nozzle assemblies NOT affixed to your boom tube Follow the instructions below to attach these properly...

Page 5: ...nstall the pressure gauge Hand tighten securely DO NOT OVER TIGHTEN Detail B Screw the lid onto the tank Place the end of the lanyard through the tab in the tank This is so the lid can hang off the ta...

Page 6: ...connect the negative black connection and finally the positive red connection The lead wire has an On Off switch to activate the pump is on and O is off Fill the tank part way with water and then add...

Page 7: ...Sprayer When sprayer is not in use release Cam Lock Handles This is to prevent deforming of Cam Lock Mechanism Do not use QR bracket Cams to hold and store boom in vertical position Winter Storage Pr...

Page 8: ...u do this your switch assembly will need to be replaced Check the fuse if applicable Check for low voltage at the power supply Pump does not prime Check for air leaks in supply line Check for debris i...

Page 9: ...Page 9 See Boom Detail Next Page Exploded View Parts List FS ATV 25BL 5301406 See Plumbing Detail Next Page...

Page 10: ...Page 10 Center Nozzle Assembly 5275123 End Nozzle Assembly 5275122 Boomless Wet Boom Assembly Exploded View Parts List 5275260 Plumbing Detail Refer to the Parts List Previous Page for Part Numbers...

Page 11: ...Page 11 NOTES...

Page 12: ...u must 1 provide written notice to Ag Spray Equipment of the defect during the Warranty Period and within thirty 30 days after the defect becomes apparent or the repair becomes neces sary at the follo...

Reviews: