![AG Neovo X-W19 User Manual Download Page 9](http://html.mh-extra.com/html/ag-neovo/x-w19/x-w19_user-manual_2865504009.webp)
Setup
Please follow the following instructions to setup monitor.
Step 1: Remove all packing materials and wrapping from the monitor and then tear down the
plastic dust cover from the screen surface.
Step 2: With the computer or video equipment turned off, connect the signal cable.
Connecting to an IBM or IBM compatible computer
Connecting to a video equipment with digital source
Connecting to a video equipment with S-Video connector
(Optional)
To monitor
Connecting to a video equipment with CVBS jack
(Optional)
To monitor
CVBS
8
Summary of Contents for X-W19
Page 1: ......