6 - WORKING OPERATIONS
Position bagger at bagging site
Pintle hitch
The pintle hitch
(1)
on this bagger is used for towing the
bagger on the road from job site to job site. The hitch must
be removed from the transport tube
(2)
and placed in the
stored position of the tube
(3)
closest to the lift jack before
any bagging operation is started.
1. The pintle hitch brace
(4)
should be removed from be-
tween the tow hitch and bagger frame and stored on
the two storage tabs
(5)
, one by each cab end wheel.
Use the existing pins
(6)
to secure in place.
RAIL16GEN0115AA
1
RAIL16GEN0116AA
2
2. Drive the bagger to the spot where the bag is to begin.
3. Position the bagger with the tunnel toward the bag
starting point. Position the bagger perpendicular to
the path of the bag.
4. Switch Wheels From Trailer or Transport Mode to Bag-
ging Mode:
6-25
Summary of Contents for LX1214
Page 8: ......
Page 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Page 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Page 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Page 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Page 158: ...6 WORKING OPERATIONS 6 52 ...
Page 260: ...7 MAINTENANCE 7 102 ...
Page 270: ...8 TROUBLESHOOTING 8 10 ...
Page 272: ...9 SPECIFICATIONS 9 2 ...