14
Commissioning
EN
HMS
6
Commissioning
6.1
Commissioning the product
Verify that the probe is dry.
1. Select a suitable isolated, earthed power outlet.
2. Plug the control unit into the power outlet.
- The green LED is on.
3. Plug the connector of the equipment to be switched off in the case of an
alarm into the power outlet of the control unit.
- The connected device is ready for operation.
4. Perform the function test.
6.2
Performing the function test
Verify that the liquid to be detected is detected at all temperatures that
may be present at the installation site.
1. Submerge the probe into the liquid to be detected.
- The red LED lights.
- The connected device is switched off.
2. Remove the probe from the liquid.
- The red LED goes off.
- The connected device is ready for operation.