F
Max. 1 x
18
Commissioning
EN
ProCalida® EF 1
6.2
Performing the pressure test and the function test
1. Perform a pressure test with 6 bar.
- The system pressure must remain constant for at least two hours (max-
imum pressure drop 0.2 bar)
2. Perform a leak test after the two hours have passed.
3. Fill the system with water until the operating pressure is reached.
6.3
Adjusting the flow valves
6.3.1
With flow meter
A
1. Open the flow valve until the cal-
culated water volume (A) is indi-
cated at the flow meter.
2. Turn the adjustment ring all the
way to the mechanical stop of the
flow valve.
10.Open the vent screw by a
maximum of one turn (F).
Summary of Contents for EF1
Page 9: ... 327 mm 220 mm 30 mm 46 mm 79 mm 9 Produktbeschreibung DE ProCalida EF 1 ...
Page 31: ... 327 mm 220 mm 30 mm 46 mm 79 mm 9 Product description EN ProCalida EF 1 ...
Page 53: ... 327 mm 220 mm 30 mm 46 mm 79 mm 9 Description du produit FR ProCalida EF 1 ...
Page 75: ... 327 mm 220 mm 30 mm 46 mm 79 mm 9 Descripción del producto ES ProCalida EF 1 ...
Page 97: ... 327 mm 220 mm 30 mm 46 mm 79 mm 9 Descrizione del prodotto IT ProCalida EF 1 ...
Page 119: ... 327 mm 220 mm 30 mm 46 mm 79 mm 9 Descrição do produto PT ProCalida EF 1 ...
Page 141: ... 327 mm 220 mm 30 mm 46 mm 79 mm 9 Opis produktu PL ProCalida EF 1 ...