13
Commissioning
EN
MSW
6
Commissioning
6.1
Commissioning the product
1. Attach a label in the vicinity of the discharge line or to the product with the
following text:
"For safety reasons, water must be able to escape via the discharge
line during heating. Do not shut off!"
2. Check all connections for tightness.
3. Flush all lines of the system prior to commissioning.
6.2
Function test
1. Provide a container to collect the liquid of the product.
2. Protect all persons from escaping liquid.
3. Open the product by turning the cap.
- Liquid escapes.
4. Release the cap.
- No liquid may escape.
7
Operation
Verify that liquid can escape via the discharge line during heating up.
1. If the product has triggered, check the system before recommissioning
the system.
2. Perform a function test (see chapter "Function test").
Summary of Contents for 42421
Page 17: ...16 Anhang DE MSW 14 Anhang 14 1 EU Konformitätserklärung ...
Page 33: ...16 Appendix EN MSW 14 Appendix 14 1 EU Declaration of Conformity ...
Page 49: ...16 Annexe FR MSW 14 Annexe 14 1 Déclaration de conformité UE ...
Page 65: ...16 Aneks PL 14 Aneks 14 1 Deklaracja zgodności UE ...
Page 81: ...16 Anexă RO MSW 14 Anexă 14 1 Declarație de conformitate UE ...