Operation
16
4.Operation
4.1 Control Panel
1
3
5
2
4
UP
DOWN
ESC
ENT
6
POWER
FAULT
COM
IItteem
mss
N
Noo..
IItteem
mss
N
Noo..
1
2
3
4
5
6
LCD Display
FAULT
LED Indicator
COM
LED Indicator
ESC
Touch Button
UP
Touch Button
DOWN
Touch Button
ENT
Touch Button
POWER
LED Indicator
Grid
Load
PV Inverter
PV Inverter
PV Inverter
Distribu�on Cabinet
L1
L1‘
L2’
L3’
L2
L3
PV Array
RS485 / WiFi / Ethernet / GPRS
Afore Smart Meter
PV Array
PV Array
Router
Cloud Server
Weather Sta�on
Energy Meter
Note:
The Inverter could be connected in parallel with Smart Meter,
make sure the total load power not exceed Smart Mater’s limitation.