52 Maintenance
4510012 - REV F – 220621
Maintenance Schedule
Adherence to the maintenance schedule below will extend the life of the GEN-S, ensure the
best performance, and reduce the likelihood of injury.
Frequency
Maintenance Task
Every hour during operation
Visually check the water level in the Sight Glass.
Check for leaks from the Sight Glass. If leaks are found, tighten
the Sight Glass fixture nuts or replace the Sight Glass gaskets
Every 4 hours during first week
Perform blowdown procedure (see “Blowdown Procedure” on
).
Daily at end of workday
Perform blowdown procedure (see “Blowdown Procedure” on
).
Every 2 weeks
Clean or replace the Strainer (see “Cleaning or Replacing the
).
Every 3 months
Perform manual cleanout (see “Manual Cleanout” on page
).
Check and clean the Probes (see “Checking and Cleaning the
).
Summary of Contents for STC-WSN300-2M
Page 1: ...WSN GEN S Steam Heat Shrink Tunnel User Guide ...
Page 2: ...2 Abbreviations 4510012 REV F 220621 ...
Page 8: ...8 Abbreviations 4510012 REV F 220621 ...
Page 66: ...66 Troubleshooting 4510012 REV F 220621 ...
Page 67: ...Electrical Schematics 67 4510012 REV F 220621 Electrical Schematics Complete System WSN GEN S ...
Page 68: ...68 Electrical Schematics 4510012 REV F 220621 Boiler ...
Page 72: ...72 Parts List 4510012 REV F 220621 Exploded Diagrams Stand Drawing Number YS130EX2 01 ...
Page 74: ...74 Parts List 4510012 REV F 220621 Tunnel Drawing Number YS130EX2 02 ...
Page 78: ...78 Parts List 4510012 REV F 220621 Boiler ...
Page 79: ...Parts List 79 4510012 REV F 220621 Inside Boiler Electrical Cabinet ...