Operation 15
4510003 Rev B
Operation
Startup
1. Before starting the ES-200A Heat Tunnel, double-check the installation.
2. Verity that all power cables are properly connected.
3. Turn the Heat Tunnel Power Switch located on the front of the Control Cabinet to the
ON position.
4. Turn the conveyor power switch to the ON position.
Heat Tunnel
Power Switch
Conveyor Power Switch
Summary of Contents for ES-200A
Page 1: ...4510003 Rev B ES 200A Convection Heat Shrink Tunnel User Guide ...
Page 2: ...4510003 Rev B ...
Page 4: ...4510003 Rev B ...
Page 25: ...Schematic Diagrams 25 4510003 Rev B Fan Inverter Setting 2 1 M FAN FAN FAN M M 1 2 3 ...
Page 26: ...26 Schematic Diagrams 4510003 Rev B ES 200A Wiring Diagram ...
Page 27: ...Schematic Diagrams 27 4510003 Rev B ...
Page 28: ...28 Schematic Diagrams 4510003 Rev B ...
Page 40: ...4510003 Rev B ...
Page 41: ...4510003 Rev B ...