background image

This reactor is designed to be used within a sump. Ensure that the reactor can sit flat on 

the sump floor and is not touching the sides of the sump, baffles or any plumbing. This 

will ensure the quietest performance from the reactor. The pump must be completely 

submerged underwater during operation. To release air from the reactor body remove 

the top-up lid then replace.

CAUTION: DO NOT APPLY EXCESSIVE PRESSURE WHILST 

REMOVING/REPLACING THE TOP-UP LID 

AFM Marine warrants this AFM Marine product to the original purchaser against 

defective material and workmanship that occurs during normal non-commercial 

use for 12-months from the date of purchase. 

The Company will at its discretion, either repair or replace same without charge. 

Said warranty is limited to replacement or repair of product only and does not 

cover loss of aquarium life, personal injury, property loss, or damage arising from 

use of the product. Original proof of purchase is required to validate warranty.
Exclusions:
a. Damage resulting from accident, misuse, lack of reasonabe care, subjecting the 
product to abnormal working conditions or any other failure not resulting from 

defects in materials or workmanship.
b. Damage resulting from modification, tampering with or attempted repair by 

anyone other than the Company.
c. Transfer of the product to someone other than the original consumer or 

purchaser.
What You Must do to Enforce Warranty:
Your first point of contact is the retailer the product was purchased from; in the 

unlikely event that you the end user remain dissatisfied please email us at 

[email protected]

 Please open the package carefully and check for damaged or lost parts.

Main Bio Pellet reactor body and lid. 

Sicce Syncra Silent pump.

Never connect the AFM Marine BP-1.0/2.0 Reactor (product) to the power outlet 

whilst your hands are wet.
Do not allow the pump to run dry. Keep the pump fully submerged during 

operation failure to do so could damage the pump and cause failure.
Ensure that there is a drip-loop in the pump cord to prevent water running down 
the cord and reaching the plug/power outlet.

Always unplug the product from the power outlet prior to the product 

maintenance. 

While we take great care to keep any contaminates away from our products during 

manufacture please take a moment to clean the reactor before use. (only clean your 

reactor with warm water; never clean with any soap or chemicals and use caution 

when handling as acrylic scratches easily)
For best performance, it is important to clean the body of the chamber during routine 

media swaps; and keep the perforated inlet and outlet assembly clear of debris and 

growth at all times. 
Regular maintenance of the pump will ensure a long life and maximum performance.

For the first few days of operation if the bio pellets clump together you may need to 

turn the pump off and on to allow the clumps to settle and break up. No further 

action should be required once the pellets have gone through this initial “breaking-in” 

process.
For best results, place the outlet of the reactor near your protein skimmers intake 

pump; this will help remove excess bacteria/mulm and re-oxygenate the water. 

To remove the body cover, loosen the thumb screws, a total of (five on the BP-1.0 

and seven on the BP-2.0).
Pour your bio pellets into the chamber of the body; ensuring you do not overfill 

the media chamber (<500 ml BP-1.0 and <1000 ml BP-2.0).
Align the body cover and tighten thumb screws in a star pattern to evenly 

secure.
Connect the water outlet of the pump to the main reactor body. 

CAUTION: DO NOT OVER TIGHTEN THE SCREWS

Reviews: