background image

21-07-2015

9

België:

Durmelaan 20

9880   Aalter

België

Tél. 

+32 9 381 61 01

Fax 

+32 9 381 61 00

E-mail [email protected]

Nederland:

Koopvaardijweg 6

4906 CV Oosterhout

Nederland

Tél. 

+31 162 43 51 51

Fax 

+31 162 43 98 28

E-mail [email protected]

Mauritius:

C/O Interface Management Services LTD

9th Floor, Raffles Tower 19

Cybercity, Ebene 

Maurice

Tél. 

+230 404 6030

Mob 

+230 499 0920

E-mail [email protected]

Turkije:

Ofis/Depo adres: Orhanlı merkez Mah. Dervi

ş

 sok. 

No: 24/1 

PK 34956 Orhanlı/Tuzla Gat Lojistik Genel 

Müdürlük binası

VD: TUZLA / VN: 0080773715  S

İ

C

İ

L NO: 781569

Tél. 

+90 216 639 40 08

Fax 

+90 0216 639 40 09

E-mail  [email protected]  

Marokko:

Hayati AVCI

Route de Sidi Bouzid / O.C.P

El Jadida

Tél. 

+212 523 383 952

E-mail [email protected]

Qatar:

Sanam Services WLL
(Bin Arbaid Group)
P. O Box 60072, Al Khor, Qatar.

Tel.: 

+974 4472 1849

 

+974 4472 1875

Mob.:  +974 6679 3307

Fax 

+974 4472 2680

E-mail 

[email protected]

Nigeria:

14th floor, Churchgate Tower, AfriBank Road, 

Victoria Island, Lagos

E-mail [email protected] 

 

Romania and Bulgaria:

FET International Services SRL

Strada Turnului nr. 5

500152 Braşov, Romania

Mob.  +40 727 82 39 82

Tel. 

+40 368 46 95 45

E-mail [email protected]

 [email protected]

Summary of Contents for FAST FIX

Page 1: ...FAST FIX ACCESS LADDERS ASSEMBLY GUIDE AS9999 323 07 2015...

Page 2: ...FAST FIX system scaffold is tested according to the norms NBN EN 12810 1 NBN EN 12810 2 NBN EN 12811 1 NBN EN 1288 2 NBN 1288 3 This means that the AFIX FAST FIX scaffold may be used in Austria Belgi...

Page 3: ...l or destroyed P Study the FAST FIX assembly and user guide 1a Fit the collars over the adjustable base plates and swivelthewing nut 50mm upwards 1b Place the complete base plane Connect collars using...

Page 4: ...INSTRUCTIONS 3 Place the 3m standards in the collars of the base 4 At a height of 2m fit ledgers in longitudinal and cross direction 5 Place the first alu plat form stair and slide it to the outside...

Page 5: ...il over internal beam of the platform stair and srew on the bolt nut connections Place the stair guard rail at the top edge over the ledgers and at the bottom over the guard rail adapters Knock the we...

Page 6: ...ach 3 0m standard 10 Mount the necessary ledgers at 2 0m above the 1st platform stair 11 Mount the next plat form stair in opposite direc tion 12 Mount at one side 2 led gers at 0 5 an 1 0m above the...

Page 7: ...ard rails are secured 14 Fix diagonal braces all 4 sides Repeat step 9 14 un til you reach the required height 15 Mount 2 steel decks next to the platform stair Important Secure every deck with lock a...

Page 8: ...dder to comply the basic rules CONSTRUCTION VARIANTS A when you need a access ladder who can lift up secure the standards with locking clips Afix advise customers to use standards with dismantable spi...

Page 9: ...stik Genel M d rl k binas VD TUZLA VN 0080773715 S C L NO 781569 T l 90 216 639 40 08 Fax 90 0216 639 40 09 E mail info afixgroup com Marokko Hayati AVCI Route de Sidi Bouzid O C P El Jadida T l 212 5...

Reviews: