background image

 

2016 AFG Baby Furniture R219 Assembly Sheet ©

 

7

 

R219 Crib Assembly Sheet

 

 

STEP 2:  

 

 
 

 

 

 
 

a.

 

Insert one Wood Dowel into the second top hole of Left Side Panel (A) and one Barrel Nut (6) into the bottom 
hole of Left Side Panel. Attach Front Left Leg (F) to Left Side Panel (A) by inserting 1 Bolt (#2) into the first 
top hole and 1 Bolt (# 4)  into the bottom hole of Left Side Panel (A)  

b.

 

Repeat

 

above

 steps on the opposite side. 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for R219

Page 1: ...COMMERCIAL USE If you have any questions or missing parts please contact us DO NOT return product parts to the store where it was purchased before contacting AFG Customer Service AFG Customer Service...

Page 2: ...our physician DO NOT use a water mattress with this crib If refinishing use a non toxic finish specified for children s products Check fasteners periodically and never over tighten then as this may ca...

Page 3: ...r product where it will receive prolonged sunlight exposure Care and Cleaning Do not scratch or chip the finish Do not use abrasive chemicals for cleaning Clean with mild soap on a soft rag Rinse and...

Page 4: ...d Hardware Diagram to make sure that all crib parts are assembled in the correct position A Left Side Panel 1 pc F Front Left Leg 1 pc B Right Side Panel 1 pc G Front Right Leg 1 pc C Footboard 1 pc H...

Page 5: ...ontact AFG for exchange or keep the original box for return authorization Crib Assembly Parts A Left Side Panel 1 pc B Right Side Panel 1 pc C Footboard 1 pcs D Rear Left Leg 1 pc E Rear Right Leg 1 p...

Page 6: ...ve or missing Contact AFG for exchange or keep the original box for return authorization Crib Assembly Hardware Item Fittings Qty 1 Bolt M6 x 80mm 10 pcs 2 BoltM6 x 45mm 6 pcs 3 Bolt M6 x 17mm 4 pcs 4...

Page 7: ...wel 7 into Bottom Hole of Headboard K Insert 1 Barrel Nuts 6 into the front holes in left corner of Headboard Top Rail L 2 Barrel Nuts 6 on the underside of top and bottom corner of Headboard K Attach...

Page 8: ...wel into the second top hole of Left Side Panel A and one Barrel Nut 6 into the bottom hole of Left Side Panel Attach Front Left Leg F to Left Side Panel A by inserting 1 Bolt 2 into the first top hol...

Page 9: ...nto the second top hole of Left side Panel and one Barrel Nut into underside of Left Side Panel A Attach Left Side Panel A to the Rear Left Leg D by inserting 1Bolt 2 into the first top hole of Real L...

Page 10: ...ut the four hangers at the corners of the mattress support and use 4 Bolts 3 to attach hangers to the brackets on the legs at an even level on all sides WARNING Make sure that the warning envelope on...

Page 11: ...bly Sheet 10 R219 Crib Assembly Sheet Step 5 a Insert 1 Wood Dowel 7 into the bottom left side hole of Footboard C and two Barrel Nuts on the underside of top and bottom corner of Footboard C b Repeat...

Page 12: ...2016 AFG Baby Furniture R219 Assembly Sheet 11 R219 Crib Assembly Sheet Crib Assembly Complete...

Page 13: ...attress Support Assembly must be in the lowest position before installing day bed a Loosen the Footboard C bolts to detach Footboard C a Attach Stabilizer Bar I to Left Side Panel A and Right Side Pan...

Page 14: ...stalling guardrail b Loosen the Stationary Side Panel C bolts to detach the Stationary Side Panel c Attach Stabilizer Bar I to Left Side Panel A and Right Side Panel B with 2 Bolts 1 2 Barrel Nuts 6 a...

Page 15: ...etal frames can be purchased at any furniture store a Attach the Headboard K Headboard Top Rail L with FrontLeft Leg F FrontRight Leg G Using this as the headboard for the full size bed b By using the...

Page 16: ...h proper description within 7 days of the purchase of the products Our warranty guarantees optimal workmanship and lack of significant defects The product warranty lasts a year from the date of your p...

Reviews: