Step 25
Step 26
18
ASSEMBLY
Hook the lower pair of
Horizontal Braces
to the
3rd Rung
of both the
Walkthrough
frames
of both the towers, as Mid rail.
Step 25.1
Step 25.1
Hook the upper pair of
Horizontal Braces
to the
4th Rung
of both the
Walkthrough
frames
of both the towers, as Guard rail.
Step 25.2
Step 25.2
Remove the
temporary safety
gate from
both the Walkthrough frames.