26
UG 20-UG 25-OI-vers. 3.5 gb. 20190409
3.2.6 Preparation for Commissioning
Attach the sensors used by you and align them roughly when they are not under
pressure.
Setting the Inductive Sensors
Remove the cover (1)
Loosen the fastening screw under the
cover (slot-head screwdriver, size 00)
Adjust the set screws for stroke
detection (2)
Check the sensor for proper
functioning and readjust, if necessary
Retighten the fastening screw
Reinstall the cover
Start-up of the UG Universal gripper
Aerate the total system slowly.
Pay attention to the permissible values (technical data) regarding:
-
load capacity
-
motion frequency
-
moment loads on the guide system
CAUTION
Limbs may be squeezed by moving components.
Make sure that there are no persons or tools within the operating range of the
module.
Carry out a test run
-
at first at slow traverse speed,
-
afterwards under operating conditions.
1
2
Summary of Contents for UG 20 Series
Page 15: ...UG 20 UG 25 OI vers 3 5 gb 20190409 15 3 1 7 Dimensions drawing UG 20...
Page 16: ...16 UG 20 UG 25 OI vers 3 5 gb 20190409 3 1 8 Technical data of the UG 20...
Page 17: ...UG 20 UG 25 OI vers 3 5 gb 20190409 17 3 1 9 Preferred combinations UG 20...
Page 18: ...18 UG 20 UG 25 OI vers 3 5 gb 20190409 3 2 0 Module stresses UG 20...
Page 19: ...UG 20 UG 25 OI vers 3 5 gb 20190409 19...
Page 20: ...20 UG 20 UG 25 OI vers 3 5 gb 20190409 3 2 1 Dimensions drawing UG 25...
Page 21: ...UG 20 UG 25 OI vers 3 5 gb 20190409 21 3 2 2 Technical data of the UG 25...
Page 22: ...22 UG 20 UG 25 OI vers 3 5 gb 20190409 3 2 3 Preferred combinations UG 25...
Page 23: ...UG 20 UG 25 OI vers 3 5 gb 20190409 23 3 2 4 Module stresses UG 25...
Page 24: ...24 UG 20 UG 25 OI vers 3 5 gb 20190409...
Page 34: ...34 UG 20 UG 25 OI vers 3 5 gb 20190409...