Aerovent IM-200 Installation, Operation And Maintenance Instructions Download Page 1

Installation

1. Install the door heater in position required.

Dimensions can vary to suit door opening. Heaters
can be mounted in horizontal, angular or vertical
position. Do not mount with control box upside
down or on the bottom. Weight of unit is approxi-
mately 375 lbs. 

NOTE:

Negative pressure in the building will have

an affect on unit’s ability to maintain an air curtain
effect. This should be taken into account when locat-
ing the unit.

2. Connect electrical power. If the unit does not have a

built-in disconnect switch, then an external discon-
nect should be provided by the installer. Be sure
power supply is the proper voltage. These units are
furnished for specified voltage.

Gas Door Air Heater

©1997 Aerovent

3. Connect gas supply line using the regulator fur-

nished with the unit. Consult your gas company ser-
vice representative to determine the proper size for
the gas line. This varies according to the pressure
and length of the run. Required gas input can be
determined by the chart, Fig. 1.

Fig. 1

NATURAL. GAS

INPUT

NOMINAL

GAS

MODEL NO.

BTU

TEMP. RISE

PRESS.

24S728

325,000

73°F

1 oz.

NDH*

440,000

99°F

2 oz.

3/4 HP

580,000

131°F

3 oz.

440,000

66°F

2 oz.

580,000

85°F

3 oz.

24S728

680,000

102°F

4 oz.

NDH*

790,000

118°F

5 oz.

2 HP

870,000

130°F

6 oz.

990,000

148°F

7 oz.

*PDH = Propane units

4. Mount operating station in a convenient location and

make connections to the terminal strip in the unit as
indicated in Fig. 2, or Fig. 3 for units supplied with
optional high-low fire feature.

Fig. 2. Operating Station

Connect H, 1, 2, and R to terminal

strip in unit control box.

Fig. 3. Operating Station with Optional Hi-Lo Fire

Connect H, 1, 2, R, 13 and 15 to

terminal strip in unit control box.

13'

12'

13'

4'

45

°

Typical Overhead Door

Angular Mounting Approx. 45°

14'

12'

5'

18" Min. Clearance

Roll Top or Straight Lift Door

Vertical Mounting Used With Roll Top Doors

1

1

1

2

2

H

H

R

R

Back of Lid

Box

Lamp

1

2

1

1

2

2

H

H

R

R

13 15

Lamp

Back of Lid

Box

General Installation, Operation and Maintenance Instructions For Aerovent Products

IM-200

June 1997

Summary of Contents for IM-200

Page 1: ...pressure and length of the run Required gas input can be determined by the chart Fig 1 Fig 1 NATURAL GAS INPUT NOMINAL GAS MODEL NO BTU TEMP RISE PRESS 24S728 325 000 73 F 1 oz NDH 440 000 99 F 2 oz 3 4 HP 580 000 131 F 3 oz 440 000 66 F 2 oz 580 000 85 F 3 oz 24S728 680 000 102 F 4 oz NDH 790 000 118 F 5 oz 2 HP 870 000 130 F 6 oz 990 000 148 F 7 oz PDH Propane units 4 Mount operating station in ...

Page 2: ...ly when door is completely open Installation 3 Overhead Location Switch is in free position when door is open Use switch terminals 1 and 2 Heater will fire when door starts to open FREE POSITION 360 location on actuator shaft ACTUATOR SHAFT OPERATING HEAD May be relocated four 90 positions LEVER LOCKING NUT Loosen to to relocate free position of adjustable roller lever TERMINAL CONNECTIONS 1 2 Nor...

Page 3: ...set at 200 F If spark is not occurring check spark plug Gap should be 072 and electrode should be clean no carbon If flame relay has power to it but flame cycle will not occur reset flame relay manual reset If flames comes on momentarily and goes out check flame rod There should not be any cracks in porcelain Flame rod senses current in flame To check if it is functioning plug voltmeter into ampli...

Page 4: ...ate 2 Remove high fire adjusting screw spring and plunger A small magnet is useful for this purpose Handle plunger carefully to avoid marring or collect ing dirt Do not lubricate 3 Modulation or Staging Using low fire adjusting screw set manifold pressure to manufacturer s specifications 50 to 75 of high fire 4 Modulation or Staging Cycle solenoid gas valve to check for proper ignition 5 Modulatio...

Reviews: