22
DISCUS BREAKDOWN FOR SHIPPING IN TWO METERS LONG PACKAGE (Discus B
model only)
Discus breakdown in two meters long package is basically the
reverse of Discus reassembly from two meters long package.
Refer to the pictures in the section above if necessary.
After the sail has been removed from the frame (see the section
“Removing the sail from the frame and re-installing”) and rear
leading edges have been unplugged, proceed to the following
steps.
1. Lay the frame on a floor or on a clean working surface as
shown on the picture (
Photo 39
).
Photo 39
Photo 40 Photo 41
2. Detach the basebar and fold up the control bar legs. Dismount the control bar apex assembly. Install the protection bag
on the control bar upper fittings (
Photo 40
).
Carefully roll the bottom and top cables and install the protection bag on the control bar bottom fittings (
Photo 41
).
3. Remove the middle leading edge / rear crossbar tubes assembly from the front leading edges and at the same time
from the front crossbar.
4. Remove the rear keel / middle keel tube assembly from the front keel.
Summary of Contents for Discus 12
Page 29: ...29...
Page 30: ...30...
Page 31: ...31...
Page 32: ...32...
Page 33: ...33...
Page 34: ...34...
Page 35: ...35...
Page 36: ...36...
Page 37: ...37...
Page 38: ...38...
Page 39: ...39...
Page 40: ...40...
Page 41: ...41...
Page 42: ...42...
Page 43: ...43...
Page 44: ...44...
Page 45: ...45...
Page 46: ...46...
Page 47: ...47...
Page 48: ...48...
Page 49: ...49...
Page 50: ...50...
Page 51: ...51...
Page 52: ...52...
Page 53: ...53...
Page 54: ...54...
Page 55: ...55...
Page 56: ...56...
Page 57: ...57...
Page 58: ...58...
Page 59: ...59...
Page 60: ...60...
Page 61: ...61...
Page 62: ...62...
Page 63: ...63...